Commissioning

After SV Counting Stars was offloaded, she was moved to the Leopard docks at the Harbour Towne Marina in Dania Beach, FL to begin commissioning.

Decking in the cockpit and heads was installed as well as the all-weather cushions and sun pads. Next was the running rigging, sail bag and sails. Dual fresh/salt water switch added to all heads. All systems were thoroughly tested before sailing her down to her slip at the Miami Boat Show.